The Sacramento Railyards (or Railyard Specific Plan) is an urban infill project of approximately 244 acres (99 ha) at the western terminus of the First transcontinental railroad located within Sacramento's Central City community, between the downtown Central Business District and the River District, near the confluence of the American and Sacramento rivers. The property is owned by Downtown Railyard Ventures, LLC. The Sacramento Railyards was master-planned by the Jerde Partnership firm. Construction will take 15 to 20 years with a projected build-out to last until the late 2020s.
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
foaf:homepage | |
geo:lat |
|
geo:long |
|
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
Link from a Wikipage to an external page | |
sameAs | |
dbp:wikiPageUsesTemplate | |
georss:point |
|
has abstract |
|
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is location of | |
is Link from a Wikipage to another Wikipage of | |
is Wikipage redirect of | |
is location of | |
is foaf:primaryTopic of |