The School District of Rhinelander (SDR) is located in Rhinelander, Wisconsin. Approximately 2,900 students are enrolled. In 2005 a referendum to keep three local schools open failed, combining fourth and fifth grade students into one intermediate school and all of the kindergarten-third grade students into two schools. In 2008 another referendum failed resulting in budget cuts to the High School's pool and field house. Again in 2010 the district ran a referendum, this time passing, allowing the secondary schools to remain in separate buildings. In late 2010 the school district was given a grant, resulting in 13.7 million dollars of heavy renovation throughout the district.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - School District of Rhinelander (en)
|
rdfs:comment
| - The School District of Rhinelander (SDR) is located in Rhinelander, Wisconsin. Approximately 2,900 students are enrolled. In 2005 a referendum to keep three local schools open failed, combining fourth and fifth grade students into one intermediate school and all of the kindergarten-third grade students into two schools. In 2008 another referendum failed resulting in budget cuts to the High School's pool and field house. Again in 2010 the district ran a referendum, this time passing, allowing the secondary schools to remain in separate buildings. In late 2010 the school district was given a grant, resulting in 13.7 million dollars of heavy renovation throughout the district. (en)
|
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
has abstract
| - The School District of Rhinelander (SDR) is located in Rhinelander, Wisconsin. Approximately 2,900 students are enrolled. In 2005 a referendum to keep three local schools open failed, combining fourth and fifth grade students into one intermediate school and all of the kindergarten-third grade students into two schools. In 2008 another referendum failed resulting in budget cuts to the High School's pool and field house. Again in 2010 the district ran a referendum, this time passing, allowing the secondary schools to remain in separate buildings. In late 2010 the school district was given a grant, resulting in 13.7 million dollars of heavy renovation throughout the district. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is district
of | |
is foaf:primaryTopic
of | |