About: Sistema Interconectado Central     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatElectricPowerTransmissionSystemsInChile, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/3VGK4aVZ8z

The Sistema Interconectado Central (Spanish for Central Interconnected System) or SIC was the main alternating current power grid in Chile spanning all of Chile from Atacama Region in the north to Los Lagos Region in the south. SIC transmitted 68.5% of the national generation and served 93% of Chile's population. As of December, 2011, it had a total installed capacity of 12,904 MW (gross)

AttributesValues
rdf:type
rdfs:label
  • Sistema Interconectado Central (en)
  • Центральная синхронная система (ru)
rdfs:comment
  • Центральная синхронная система (Sistema Interconectado Central, SIC) — основная энергосистема переменного тока в Чили, охватывающая всю территорию страны от области Атакама на севере до Лос-Лагоса на юге. SIC объединяет 68,5% национальной генерации и обслуживает 93% населения Чили. По состоянию на декабрь 2011 года общая установленная мощность составляла 12,9 ГВт (брутто) . (ru)
  • The Sistema Interconectado Central (Spanish for Central Interconnected System) or SIC was the main alternating current power grid in Chile spanning all of Chile from Atacama Region in the north to Los Lagos Region in the south. SIC transmitted 68.5% of the national generation and served 93% of Chile's population. As of December, 2011, it had a total installed capacity of 12,904 MW (gross) (en)
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The Sistema Interconectado Central (Spanish for Central Interconnected System) or SIC was the main alternating current power grid in Chile spanning all of Chile from Atacama Region in the north to Los Lagos Region in the south. SIC transmitted 68.5% of the national generation and served 93% of Chile's population. As of December, 2011, it had a total installed capacity of 12,904 MW (gross) Since 2017, the grid was joined and synchronized with the Northern Synchronized Grid (Sistema Interconectado del Norte Grande Spanish) and the total installed capacity of the new grid, called Sistema Eléctrico Nacional (SEN) (Spanish for National Electrical System), was 31,709 MW as of April 2022. (en)
  • Центральная синхронная система (Sistema Interconectado Central, SIC) — основная энергосистема переменного тока в Чили, охватывающая всю территорию страны от области Атакама на севере до Лос-Лагоса на юге. SIC объединяет 68,5% национальной генерации и обслуживает 93% населения Чили. По состоянию на декабрь 2011 года общая установленная мощность составляла 12,9 ГВт (брутто) . (ru)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software