About: Stateline Solar     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:PowerStation, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/AFsq8h7P7t

Desert Stateline Solar Facility is a 300 MWp (about 250 MWAC) utility-scale solar photovoltaic power station constructed by First Solar in San Bernardino County California. It is located at the base of Clark Mountain in California, across the state line from Primm, Nevada and adjacent to the Ivanpah Solar Power Facility. The project uses approximately 3.2 million panels from First Solar, an amount similar to the 250 MWAC Moapa Southern Paiute Solar Project.

AttributesValues
rdf:type
rdfs:label
  • Stateline Solar (en)
rdfs:comment
  • Desert Stateline Solar Facility is a 300 MWp (about 250 MWAC) utility-scale solar photovoltaic power station constructed by First Solar in San Bernardino County California. It is located at the base of Clark Mountain in California, across the state line from Primm, Nevada and adjacent to the Ivanpah Solar Power Facility. The project uses approximately 3.2 million panels from First Solar, an amount similar to the 250 MWAC Moapa Southern Paiute Solar Project. (en)
foaf:name
  • Stateline Solar (en)
name
  • Stateline Solar (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Primm_Solar_Farms.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
solar type
dbp:wikiPageUsesTemplate
thumbnail
country
  • United States (en)
location
operator
  • First Solar (en)
owner
  • Southern Company and First Solar (en)
status
  • O (en)
commissioned
  • September, 2016 (en)
georss:point
  • 35.58555555555556 -115.43583333333333
has abstract
  • Desert Stateline Solar Facility is a 300 MWp (about 250 MWAC) utility-scale solar photovoltaic power station constructed by First Solar in San Bernardino County California. It is located at the base of Clark Mountain in California, across the state line from Primm, Nevada and adjacent to the Ivanpah Solar Power Facility. The project uses approximately 3.2 million panels from First Solar, an amount similar to the 250 MWAC Moapa Southern Paiute Solar Project. The plant's first 150 megawatts (MW) came online in late 2015, and the plant entered full commercial operation in the third quarter of 2016. In September 2015, it was announced that Southern Company had purchased a controlling interest in the project. First Solar continues to operate the facility. Power is sold to Southern California Edison under a 20-year power purchase agreement. (en)
ps annual generation
ps electrical cap fac
ps electrical capacity
capacity factor
prov:wasDerivedFrom
page length (characters) of wiki page
opening year
status
  • O
operator
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-115.43583679199 35.585556030273)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 76 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software