Stockyard Hill Wind Farm is a wind farm project in Victoria (Australia). In May 2022 the project achieved its 5th hold point test, and was approved by the Australian Energy Market Operator and Network Services Provider to generate up to 400MW into the National Electricity Market. When it is fully commissioned, it is expected to produce up to 530MW, which would be Australia's largest wind farm. In 2013 Origin contemplated selling the project before production would have begun, but decided to continue the project.

AttributesValues
rdf:type
rdfs:label
  • Stockyard Hill Wind Farm (en)
rdfs:comment
  • Stockyard Hill Wind Farm is a wind farm project in Victoria (Australia). In May 2022 the project achieved its 5th hold point test, and was approved by the Australian Energy Market Operator and Network Services Provider to generate up to 400MW into the National Electricity Market. When it is fully commissioned, it is expected to produce up to 530MW, which would be Australia's largest wind farm. In 2013 Origin contemplated selling the project before production would have begun, but decided to continue the project. (en)
foaf:name
  • Stockyard Hill Wind Farm (en)
foaf:homepage
name
  • Stockyard Hill Wind Farm (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Stockyard_Hill_Wind_Farm_Logo.png
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
wind farm type
  • Onshore (en)
wind hub height
wind rotor diameter
dbp:wikiPageUsesTemplate
thumbnail
operator
owner
status
  • O (en)
website
georss:point
  • -37.535833333333336 143.2513888888889
has abstract
  • Stockyard Hill Wind Farm is a wind farm project in Victoria (Australia). In May 2022 the project achieved its 5th hold point test, and was approved by the Australian Energy Market Operator and Network Services Provider to generate up to 400MW into the National Electricity Market. When it is fully commissioned, it is expected to produce up to 530MW, which would be Australia's largest wind farm. The development was initiated by Windpower Australia and bought by Origin Energy. In May 2017, Origin sold the development to Goldwind Australia for A$110 million and signed a power purchase agreement to buy the electricity and Renewable Energy Certificates for less than A$60/MWh. The facility consists of 149 approved wind turbines at a site approximately 35km west of Ballarat between Beaufort and Skipton. The forecast cost is A$900 million (US$750 million) In December 2009, the original plan for 242 turbines, the plan was changed to only have 157 turbines. The Victorian minister of planning approved the 157 turbines, in October 2010. In 2013 Origin contemplated selling the project before production would have begun, but decided to continue the project. Construction commenced in May 2018 on a design that has 149 wind turbines. The final turbine installation occurred in December 2020 and operations began in July 2021. The Goldwind 3S turbines have a capacity of 3.57 MW, with a hub height of 110 metres, tip height of 180 metres, and rotor diameter of 140 metres. The farm is projected to generate 1900 GWh of energy annually, at a corresponding capacity factor of about 40.9%. It will power approximately 425,000 homes annually. Origin Energy has a power purchase agreement to buy all electricity until 2030. (en)
construction began
  • May 2018 (en)
ps annual generation
ps electrical cap fac
ps electrical capacity
ps units manu model
  • Goldwind GW140-3.57MW (en)
ps units operational
gold:hypernym
building start year
capacity factor
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • May 2018
status
  • O
average annual gro...er generation (J)
installed capacity (W)
operator
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(143.2513885498 -37.535831451416)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software