The Sunraysia Solar Farm is a solar farm under construction south of Balranald in south western New South Wales, Australia. It is expected to be completed around the end of 2019. The Sunraysia Solar Farm is owned by and is being designed and built by . Construction started in early 2019. Immediately north of the Sunraysia Solar Farm, the Limondale Solar Farm has been commissioned. Both solar farms will connect to the same 220kV TransGrid substation.

AttributesValues
rdf:type
rdfs:label
  • Sunraysia Solar Farm (en)
rdfs:comment
  • The Sunraysia Solar Farm is a solar farm under construction south of Balranald in south western New South Wales, Australia. It is expected to be completed around the end of 2019. The Sunraysia Solar Farm is owned by and is being designed and built by . Construction started in early 2019. Immediately north of the Sunraysia Solar Farm, the Limondale Solar Farm has been commissioned. Both solar farms will connect to the same 220kV TransGrid substation. (en)
foaf:name
  • Sunraysia Solar Farm (en)
foaf:homepage
name
  • Sunraysia Solar Farm (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
solar type
  • PV (en)
dbp:wikiPageUsesTemplate
country
  • Australia (en)
location
  • South of Balranald, New South Wales (en)
owner
status
  • UC (en)
website
georss:point
  • -34.81 143.49
has abstract
  • The Sunraysia Solar Farm is a solar farm under construction south of Balranald in south western New South Wales, Australia. It is expected to be completed around the end of 2019. The Sunraysia Solar Farm is owned by and is being designed and built by . Construction started in early 2019. Fifty percent of the output of the Sunraysia Solar Farm energy will supply AGL Energy, and twenty-five percent will be supplied to the University of New South Wales. The rest will be sold into the National Electricity Market. It is part of AGL's plan to replace the output of its coal-fired Liddell Power Station which is due to close in 2022. Immediately north of the Sunraysia Solar Farm, the Limondale Solar Farm has been commissioned. Both solar farms will connect to the same 220kV TransGrid substation. (en)
construction began
  • January 2019 (en)
ps electrical capacity
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • January 2019
status
  • UC
installed capacity (W)
country
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(143.49000549316 -34.810001373291)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software