About: Tehran Metro Line 1     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FTehran_Metro_Line_1

Tehran Metro Line 1, coloured red on system maps runs north-south and is 36.6 kilometers (22.7 mi) of which 14.9 km (9.3 mi) is underground (from Tajrish station to Shush Station) and the rest at grade (at surface level). The number of stations along this line is 29 of which 22 stations are underground and 7 above. As of 2005, the line's total capacity is 650,000 passengers per day and trains make a scheduled stop of 20 seconds per station. The trains are made up of seven wagons, giving a nominal capacity of 1,300 seated and standing passengers. The maximum speed of the trains is 80 km/h (50 mph) per hour in practice tempered to an average 45 km/h (28 mph) due to station stops.

AttributesValues
rdf:type
rdfs:label
  • Ligne 1 du métro de Téhéran (fr)
  • Tehran Metro Line 1 (en)
rdfs:comment
  • La ligne 1 du métro de Téhéran est une ligne du réseau de métro de Téhéran, capitale de l'Iran. Comprenant 29 stations, elle est d'orientation globale nord-sud et traverse le centre de la ville. Elle est en correspondance avec les trois autres lignes du réseau. (fr)
  • Tehran Metro Line 1, coloured red on system maps runs north-south and is 36.6 kilometers (22.7 mi) of which 14.9 km (9.3 mi) is underground (from Tajrish station to Shush Station) and the rest at grade (at surface level). The number of stations along this line is 29 of which 22 stations are underground and 7 above. As of 2005, the line's total capacity is 650,000 passengers per day and trains make a scheduled stop of 20 seconds per station. The trains are made up of seven wagons, giving a nominal capacity of 1,300 seated and standing passengers. The maximum speed of the trains is 80 km/h (50 mph) per hour in practice tempered to an average 45 km/h (28 mph) due to station stops. (en)
foaf:name
  • Tehran Metro Line 1 (en)
name
  • Tehran Metro Line 1 (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Tehran_Metro_Line_1.png
  • http://commons.wikimedia.org/wiki/Special:FilePath/Tehran_Metro_map-Line_1-geo.png
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
dbp:wikiPageUsesTemplate
thumbnail
electrification
end
locale
logo
  • File:Tehran Metro Line 1.png (en)
native name
  • خط ۱ مترو تهران (en)
native name lang
  • fa (en)
open
operator
  • Tehran Urban and Suburban Railways Organization (en)
owner
start
system
type
has abstract
  • La ligne 1 du métro de Téhéran est une ligne du réseau de métro de Téhéran, capitale de l'Iran. Comprenant 29 stations, elle est d'orientation globale nord-sud et traverse le centre de la ville. Elle est en correspondance avec les trois autres lignes du réseau. (fr)
  • Tehran Metro Line 1, coloured red on system maps runs north-south and is 36.6 kilometers (22.7 mi) of which 14.9 km (9.3 mi) is underground (from Tajrish station to Shush Station) and the rest at grade (at surface level). The number of stations along this line is 29 of which 22 stations are underground and 7 above. As of 2005, the line's total capacity is 650,000 passengers per day and trains make a scheduled stop of 20 seconds per station. The trains are made up of seven wagons, giving a nominal capacity of 1,300 seated and standing passengers. The maximum speed of the trains is 80 km/h (50 mph) per hour in practice tempered to an average 45 km/h (28 mph) due to station stops. Line 1 runs mostly north-south, and the southern terminus has interchange platforms for its extension sometimes termed Metro Line 8, to Imam Khomeini International Airport completed in August 2017. A 4.1 kilometers (2.5 mi), three-station extension of the line from Mirdamad station to Qolhak opened on May 20, 2009; a 4 kilometers (2.5 mi), four-stations second phase from Qolhak to Tajrish Square was completed in 2012. Construction was to be completed by March 2007 but faced major issues due to large boulders and rock bed in part of the tunnels as well as water ingress/drainage issues. It also faced major financing issues as the government refused to release funds earmarked for the project to the municipality. (en)
depot
  • Tehran-South Depot (en)
line length (μ)
number of stations
prov:wasDerivedFrom
page length (characters) of wiki page
opening date
opening year
is part of
owner
route end
route start
type
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software