About: Three Cedars Solar Project     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:PowerStation, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/8pKCyZaFsN

Three Cedars Solar Project is a 210 MWAC (265 MWp) photovoltaic power station consisting of three units extending about 15 miles northwest of Cedar City, Utah. The project was developed by SunEdison, built with its global team of partners, and commissioned in September 2016. The electricity and renewable energy credits are being sold to Rocky Mountain Power under three separate 20-year power purchase agreements.

AttributesValues
rdf:type
rdfs:label
  • Three Cedars Solar Project (en)
rdfs:comment
  • Three Cedars Solar Project is a 210 MWAC (265 MWp) photovoltaic power station consisting of three units extending about 15 miles northwest of Cedar City, Utah. The project was developed by SunEdison, built with its global team of partners, and commissioned in September 2016. The electricity and renewable energy credits are being sold to Rocky Mountain Power under three separate 20-year power purchase agreements. (en)
foaf:name
  • Three Cedars Solar Project (en)
name
  • Three Cedars Solar Project (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/ThreeCedars-3.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/ThreeCedars-1.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
solar type
dbp:wikiPageUsesTemplate
thumbnail
cost
country
  • United States (en)
image caption
  • Iron Springs Unit (en)
location
operator
owner
  • Dominion Renewable Energy (en)
status
  • O (en)
commissioned
  • September 2016 (en)
georss:point
  • 37.721111111111114 -113.15166666666667
has abstract
  • Three Cedars Solar Project is a 210 MWAC (265 MWp) photovoltaic power station consisting of three units extending about 15 miles northwest of Cedar City, Utah. The project was developed by SunEdison, built with its global team of partners, and commissioned in September 2016. The electricity and renewable energy credits are being sold to Rocky Mountain Power under three separate 20-year power purchase agreements. (en)
construction began
  • September 2015 (en)
ps annual generation
ps electrical cap fac
ps electrical capacity
building start year
capacity factor
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • September 2015
opening year
status
  • O
operator
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-113.15166473389 37.721111297607)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 76 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software