The Tokwe Mukorsi Dam is a concrete-face rock-fill dam on the Tokwe River, just downstream of its confluence with the , about 72 kilometres (45 mi) south of Masvingo in Masvingo Province, Zimbabwe. It is 90.3 metres (296 ft) tall and creates a 1,750,000,000 m3 (1,420,000 acre⋅ft) reservoir, the largest inland dam in the country. The associated hydroelectric power station has a 12 megawatts (16,000 hp) installed capacity.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - The Tokwe Mukorsi Dam is a concrete-face rock-fill dam on the Tokwe River, just downstream of its confluence with the , about 72 kilometres (45 mi) south of Masvingo in Masvingo Province, Zimbabwe. It is 90.3 metres (296 ft) tall and creates a 1,750,000,000 m3 (1,420,000 acre⋅ft) reservoir, the largest inland dam in the country. The associated hydroelectric power station has a 12 megawatts (16,000 hp) installed capacity. (en)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
cost
| |
country
| |
image caption
| |
location
| |
location map
| |
opening
| |
purpose
| - Water storage, flood control, irrigation, fisheries, power (en)
|
status
| |
georss:point
| - -21.06284722222222 30.394441666666665
|
has abstract
| - The Tokwe Mukorsi Dam is a concrete-face rock-fill dam on the Tokwe River, just downstream of its confluence with the , about 72 kilometres (45 mi) south of Masvingo in Masvingo Province, Zimbabwe. It is 90.3 metres (296 ft) tall and creates a 1,750,000,000 m3 (1,420,000 acre⋅ft) reservoir, the largest inland dam in the country. The associated hydroelectric power station has a 12 megawatts (16,000 hp) installed capacity. Construction on the dam began in June 1998 but stalled in 2008. Salini Impregilo began to finish the dam in 2011. Heavy flooding in February 2014 caused a partial failure on 4 February, on the downstream face of the dam. By late February the dam had not been fully breached but the unplanned rising reservoir behind the dam caused evacuations upstream. Both upstream and downstream, over 20,000 people were evacuated. Construction of the dam was suspended in June 2014 due to a lack of funding. In May 2016 the government released $35 million to Salini Impregilio to enable the Italian contractor resume construction work that stopped two years ago owing to payment problems. The Dam was eventually completed in December 2016 and commissioned in May 2017. (en)
|
construction began
| |
dam crosses
| |
dam type
| - Embankment, concrete-face rock-fill (en)
|
plant commission
| |
vastest lake
| |
part
| |
river
| |
gold:hypernym
| |
building start year
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
description
| - Embankment, concrete-face rock-fill (en)
|
height (μ)
| |