The Travers Solar Project is a photovoltaic power station under construction in Vulcan County, Alberta. After first production in March 2022, it become the largest photovoltaic power station in Canada with a nameplate capacity of 465 MWAC.

AttributesValues
rdf:type
rdfs:label
  • Travers Solar Project (en)
rdfs:comment
  • The Travers Solar Project is a photovoltaic power station under construction in Vulcan County, Alberta. After first production in March 2022, it become the largest photovoltaic power station in Canada with a nameplate capacity of 465 MWAC. (en)
foaf:name
  • Travers Solar Project (en)
foaf:homepage
name
  • Travers Solar Project (en)
geo:lat
geo:long
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
solar type
  • PV (en)
dbp:wikiPageUsesTemplate
country
location
owner
status
  • Commissioned (en)
website
commissioned
  • March 2022 (en)
georss:point
  • 50.254444444444445 -112.73083333333334
has abstract
  • The Travers Solar Project is a photovoltaic power station under construction in Vulcan County, Alberta. After first production in March 2022, it become the largest photovoltaic power station in Canada with a nameplate capacity of 465 MWAC. The project received a $500 million investment from the Denmark-based investment group Copenhagen Infrastructure Partners in February 2020. Construction began in June 2021. As of September 2022, Travers was producing in excess of 360 MWAC of power for the Alberta grid, according to the Alberta Electric System Operator (AESO), in addition to having its planned capacity of 465 MWAC fully installed. (en)
construction began
  • June 2021 (en)
name official
  • Travers Solar Project (en)
ps electrical capacity
ps units operational
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • June 2021
opening year
status
  • Commissioned
country
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-112.73083496094 50.254444122314)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 55 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software