The Tuscola Bay wind farm, located in Fairgrove, Michigan and owned by NextEra Energy Partners, was put into operation in 2012. Each of the 75 wind turbines in the farm is 262 feet high, with a blade length of 150 feet. The output of each turbine is 1.6 megawatts, with a total farm output of 120 megawatts.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
sameAs | |
wind site usage |
|
dbp:wikiPageUsesTemplate | |
location | |
owner | |
commissioned |
|
georss:point |
|
has abstract |
|
name official |
|
ps electrical capacity |
|
ps units manu model | |
ps units operational |
|
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
opening year |
|
installed capacity (W) |
|
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is foaf:primaryTopic of |