Wheatridge Renewable Energy Facility is a combined wind/solar/battery power generation facility near Lexington, Morrow County, Oregon. It is owned by Portland General Electric and NextEra Energy. The project and a preliminary application were created in 2014, with a 500 MW capacity from up to 292 turbines. An application for the 230 kV interconnect to the (and thus Bonneville Power Administration and the Western Interconnection) was submitted to the Federal Energy Regulatory Commission in 2017.

AttributesValues
rdf:type
rdfs:label
  • Wheatridge Renewable Energy Facility (en)
rdfs:comment
  • Wheatridge Renewable Energy Facility is a combined wind/solar/battery power generation facility near Lexington, Morrow County, Oregon. It is owned by Portland General Electric and NextEra Energy. The project and a preliminary application were created in 2014, with a 500 MW capacity from up to 292 turbines. An application for the 230 kV interconnect to the (and thus Bonneville Power Administration and the Western Interconnection) was submitted to the Federal Energy Regulatory Commission in 2017. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 45.567 -119.623
has abstract
  • Wheatridge Renewable Energy Facility is a combined wind/solar/battery power generation facility near Lexington, Morrow County, Oregon. It is owned by Portland General Electric and NextEra Energy. The project and a preliminary application were created in 2014, with a 500 MW capacity from up to 292 turbines. An application for the 230 kV interconnect to the (and thus Bonneville Power Administration and the Western Interconnection) was submitted to the Federal Energy Regulatory Commission in 2017. The wind farm, with 120 GE turbines, came online in December 2020. The turbines are 90 meters tall (to the hub), and are 2.3MW and 2.5MW units. PGE owns 100MW of capacity, and NextEra owns 200MW. NextEra is also building 50MW of DC solar and 120MW-hours of DC battery storage on the site. These are slated for completion by the end of 2021. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-119.62300109863 45.567001342773)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software