The Yebatan Hydropower Station (Chinese: 叶巴滩水电站) is the hydropower project with the largest installed capacity in the upper reaches of the Jinsha River. It is located at the junction of Baiyu County in Sichuan Province and in Tibet Autonomous Region. Since it is an arch dam, it is also called as the Yebatan Arch Dam, with a maximum height of 217 meters. The total investment in this project is ¥ 33.36 billion, and its first generating unit is expected to be operational by 2025, and the total installed capacity is 2.24 million kilowatts.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Yebatan Hydropower Station (en)
|
rdfs:comment
| - The Yebatan Hydropower Station (Chinese: 叶巴滩水电站) is the hydropower project with the largest installed capacity in the upper reaches of the Jinsha River. It is located at the junction of Baiyu County in Sichuan Province and in Tibet Autonomous Region. Since it is an arch dam, it is also called as the Yebatan Arch Dam, with a maximum height of 217 meters. The total investment in this project is ¥ 33.36 billion, and its first generating unit is expected to be operational by 2025, and the total installed capacity is 2.24 million kilowatts. (en)
|
foaf:name
| - Yebatan Hydropower Station (en)
|
name
| - Yebatan Hydropower Station (en)
|
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
cost
| |
country
| |
location
| - at the junction of Baiyu and Konjo (en)
|
opening
| |
purpose
| - Power, flood control, navigation (en)
|
has abstract
| - The Yebatan Hydropower Station (Chinese: 叶巴滩水电站) is the hydropower project with the largest installed capacity in the upper reaches of the Jinsha River. It is located at the junction of Baiyu County in Sichuan Province and in Tibet Autonomous Region. Since it is an arch dam, it is also called as the Yebatan Arch Dam, with a maximum height of 217 meters. The total investment in this project is ¥ 33.36 billion, and its first generating unit is expected to be operational by 2025, and the total installed capacity is 2.24 million kilowatts. (en)
|
construction began
| |
part
| |
building start year
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
opening date
| |
opening year
| |
purpose
| - Power, flood control, navigation
|
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |