The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007. The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and penstock on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.

QRcode icon
QRcode image
Graph IRICount
http://dbpedia.org125 triples
Faceted Search & Find service v1.17_git139

Alternative Linked Data Documents: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] This material is Open Knowledge Creative Commons License Valid XHTML + RDFa
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 Unported License.
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 52 GB memory in use)
Copyright © 2009-2024 OpenLink Software