This HTML5 document contains 25 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
dctermshttp://purl.org/dc/terms/
dbohttp://dbpedia.org/ontology/
foafhttp://xmlns.com/foaf/0.1/
n13https://global.dbpedia.org/id/
n15http://www.bcis.co.uk/site/scripts/
rdfshttp://www.w3.org/2000/01/rdf-schema#
freebasehttp://rdf.freebase.com/ns/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
owlhttp://www.w3.org/2002/07/owl#
wikipedia-enhttp://en.wikipedia.org/wiki/
dbchttp://dbpedia.org/resource/Category:
provhttp://www.w3.org/ns/prov#
xsdhhttp://www.w3.org/2001/XMLSchema#
goldhttp://purl.org/linguistics/gold/
wikidatahttp://www.wikidata.org/entity/
dbrhttp://dbpedia.org/resource/

Statements

Subject Item
dbr:Elemental_cost_planning
rdfs:label
Elemental cost planning
rdfs:comment
Elemental cost planning is a system of and Cost control, typically for buildings, which enables the cost of a scheme to be monitored during design development. 1951 saw the publication of the Ministry of Education Building Bulletin No 4 which essentially introduced the concept of elemental cost planning to the UK construction industry. Its Author was James Nisbet. The concept has been refined and developed over more than 50 years in the UK by BCIS (the Building Cost Information Service of the Royal Institution of Chartered Surveyors).... It should :-
dcterms:subject
dbc:Business_terms dbc:Cost_engineering dbc:Building_engineering
dbo:wikiPageID
4636830
dbo:wikiPageRevisionID
953820848
dbo:wikiPageWikiLink
dbr:Comparative_cost_Analysis dbc:Building_engineering dbr:BCIS dbr:Cost_control dbr:Cost_planning dbr:Cost_overrun dbc:Business_terms dbc:Cost_engineering
dbo:wikiPageExternalLink
n15:download_info.aspx%3FfileID=108 n15:news_article.aspx%3FnewsID=137
owl:sameAs
freebase:m.0cdv7v wikidata:Q5358869 n13:4jmWJ
dbo:abstract
Elemental cost planning is a system of and Cost control, typically for buildings, which enables the cost of a scheme to be monitored during design development. 1951 saw the publication of the Ministry of Education Building Bulletin No 4 which essentially introduced the concept of elemental cost planning to the UK construction industry. Its Author was James Nisbet. The concept has been refined and developed over more than 50 years in the UK by BCIS (the Building Cost Information Service of the Royal Institution of Chartered Surveyors).... Elemental Cost Planning relies upon the adoption of a Standard Form of Cost Analysis for buildings which allows costs to be compared on a common format and forms the basis of the benchmarking analysis central to the concept of Elemental Cost Plans. It should :- * Ensure that the tender amount is close to the first estimate, or that any likely difference between the two is anticipated and is acceptable. * Ensure that the money available for the projects is allocated consciously and economically to the various components and finishes. * Always involves the measurement and pricing of approximate quantities at some stage of the process. * Aim to achieve good value at the desired level of expenditure. Elemental cost planning is often referred to as 'designing to a cost' or 'target cost planning' since a cost limit is fixed for the scheme and the architect must then prepare a design not to exceed this cost.
gold:hypernym
dbr:System
prov:wasDerivedFrom
wikipedia-en:Elemental_cost_planning?oldid=953820848&ns=0
dbo:wikiPageLength
2223
foaf:isPrimaryTopicOf
wikipedia-en:Elemental_cost_planning