This HTML5 document contains 76 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
dcthttp://purl.org/dc/terms/
dbohttp://dbpedia.org/ontology/
foafhttp://xmlns.com/foaf/0.1/
n17https://global.dbpedia.org/id/
dbthttp://dbpedia.org/resource/Template:
rdfshttp://www.w3.org/2000/01/rdf-schema#
n13http://commons.wikimedia.org/wiki/Special:FilePath/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
owlhttp://www.w3.org/2002/07/owl#
wikipedia-enhttp://en.wikipedia.org/wiki/
dbpedia-zhhttp://zh.dbpedia.org/resource/
dbphttp://dbpedia.org/property/
provhttp://www.w3.org/ns/prov#
n14http://dbpedia.org/property/speedKm/
dbchttp://dbpedia.org/resource/Category:
xsdhhttp://www.w3.org/2001/XMLSchema#
wikidatahttp://www.wikidata.org/entity/
dbrhttp://dbpedia.org/resource/
dbpedia-jahttp://ja.dbpedia.org/resource/

Statements

Subject Item
dbr:Line_1_(Xuzhou_Metro)
rdf:type
dbo:RailwayLine owl:Thing wikidata:Q728937 dbo:ArchitecturalStructure dbo:Infrastructure dbo:RouteOfTransportation
rdfs:label
Line 1 (Xuzhou Metro) 徐州地铁1号线 徐州地下鉄1号線
rdfs:comment
徐州地铁1号线是徐州地铁一条东西向线路,一期工程西起位于铜山区徐萧公路附近的路窝,东至贾汪区高铁徐州东站附近徐州东站,是为徐州市第一条开通运营的地铁线路。其连接新老城区、快速联系普铁站与高铁站,衔接人民广场、淮海广场、彭城广场、云龙万达四大商业中心,是系统内一条重要的骨干线路。 一期工程线路全长21.967km,其中高架线长0.571km,地下线长20.996km,敞开段长0.4km;与徐萧公路南侧,龟山以西,花头山以北设杏山子车辆段,在京沪高速铁路以东、京福高速公路以西,徐连公路以北设高铁停车场,在韩山商业街站、一号路站附近分别设主变电站,在一号路站附近设控制中心;全线共设18座车站,其中除路窝站1座高架站外,其余均为地下站。 Line 1 of the Xuzhou Metro (Chinese: 徐州地铁1号线; pinyin: Xúzhōu dìtiě yī hào xiàn) is a rapid transit line in Xuzhou city, Jiangsu province, China. Construction commenced in February 2014, and the line was opened on September 28, 2019. It is the first metro line to open in Xuzhou. Line 1 runs primarily east-west through Xuzhou's main commercial areas, from Luwo in the west to Xuzhou East railway station in the east. It connects the old city, Bashan area, Chengdong New Area, People's Square, Huaihai Square, and Pengcheng Square. It also connects to both major railway stations in the city. 徐州地下鉄1号線(じょしゅうちかてつ1ごうせん、正体字: 徐州地鐵1號線、簡体字: 徐州地铁1号线、英文表記: Xuzhou Metro Line 1)は、中華人民共和国江蘇省徐州市銅山区のから賈汪区の徐州東站駅まで走行する徐州地下鉄の路線である。
foaf:depiction
n13:Xuzhou_Metro_0112_approaching_Luwo_station.jpg
dbo:location
dbr:Jiangsu dbr:Xuzhou
dct:subject
dbc:Railway_lines_opened_in_2019 dbc:Xuzhou_Metro_lines
dbo:wikiPageID
58417143
dbo:wikiPageRevisionID
1086608634
dbo:wikiPageWikiLink
dbr:Xuzhou dbr:Side_platform dbr:Xuzhou_East_railway_station dbr:Jiangsu dbr:Island_platform dbr:Rapid_transit dbr:CRRC_Nanjing_Puzhen dbc:Railway_lines_opened_in_2019 dbr:China dbc:Xuzhou_Metro_lines dbr:Xuzhou_Metro
owl:sameAs
wikidata:Q47004909 dbpedia-zh:徐州地铁1号线 n17:4MsV8 dbpedia-ja:徐州地下鉄1号線
n14:h
80
dbp:stations
18
dbp:stock
6
dbp:wikiPageUsesTemplate
dbt:Stl dbt:Infobox_rail_line dbt:Rcr dbt:RouteBox dbt:Convert dbt:Start_date_and_age dbt:Rint dbt:Zh dbt:Huge dbt:Northern_Jiangsu_transit
dbo:thumbnail
n13:Xuzhou_Metro_0112_approaching_Luwo_station.jpg?width=300
dbp:c
徐州地铁1号线
dbp:locale
dbr:Xuzhou dbr:Jiangsu
dbp:nativeName
徐州地铁1号线
dbp:nativeNameLang
zh
dbp:open
2019-09-28
dbp:p
Xúzhōu dìtiě yī hào xiàn
dbp:status
Operational
dbp:system
dbr:Xuzhou_Metro
dbp:tracks
2
dbp:type
dbr:Rapid_transit
dbo:abstract
Line 1 of the Xuzhou Metro (Chinese: 徐州地铁1号线; pinyin: Xúzhōu dìtiě yī hào xiàn) is a rapid transit line in Xuzhou city, Jiangsu province, China. Construction commenced in February 2014, and the line was opened on September 28, 2019. It is the first metro line to open in Xuzhou. Line 1 runs primarily east-west through Xuzhou's main commercial areas, from Luwo in the west to Xuzhou East railway station in the east. It connects the old city, Bashan area, Chengdong New Area, People's Square, Huaihai Square, and Pengcheng Square. It also connects to both major railway stations in the city. 徐州地下鉄1号線(じょしゅうちかてつ1ごうせん、正体字: 徐州地鐵1號線、簡体字: 徐州地铁1号线、英文表記: Xuzhou Metro Line 1)は、中華人民共和国江蘇省徐州市銅山区のから賈汪区の徐州東站駅まで走行する徐州地下鉄の路線である。 徐州地铁1号线是徐州地铁一条东西向线路,一期工程西起位于铜山区徐萧公路附近的路窝,东至贾汪区高铁徐州东站附近徐州东站,是为徐州市第一条开通运营的地铁线路。其连接新老城区、快速联系普铁站与高铁站,衔接人民广场、淮海广场、彭城广场、云龙万达四大商业中心,是系统内一条重要的骨干线路。 一期工程线路全长21.967km,其中高架线长0.571km,地下线长20.996km,敞开段长0.4km;与徐萧公路南侧,龟山以西,花头山以北设杏山子车辆段,在京沪高速铁路以东、京福高速公路以西,徐连公路以北设高铁停车场,在韩山商业街站、一号路站附近分别设主变电站,在一号路站附近设控制中心;全线共设18座车站,其中除路窝站1座高架站外,其余均为地下站。
dbp:character
Underground, elevated
dbp:linelengthKm
21.97
dbo:lineLength
21970.0
dbo:numberOfStations
18
dbo:railwayRollingStock
dbr:CRRC_Nanjing_Puzhen
dbo:speedLimit
80.0
prov:wasDerivedFrom
wikipedia-en:Line_1_(Xuzhou_Metro)?oldid=1086608634&ns=0
dbo:wikiPageLength
5105
dbo:openingDate
2019-09-28
dbo:openingYear
2019-01-01
dbo:status
Operational
dbo:isPartOf
dbr:Xuzhou_Metro
dbo:type
dbr:Rapid_transit
foaf:isPrimaryTopicOf
wikipedia-en:Line_1_(Xuzhou_Metro)