This HTML5 document contains 128 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
n20http://dbpedia.org/resource/The_Colorado_Springs_area_from_1957:
dctermshttp://purl.org/dc/terms/
dbohttp://dbpedia.org/ontology/
foafhttp://xmlns.com/foaf/0.1/
n24https://web.archive.org/web/20121201202922/http:/www.dtic.mil/cgi-bin/
n17http://www.dtic.mil/cgi-bin/
n23https://global.dbpedia.org/id/
n13http://dbpedia.org/resource/AN/
n22http://www.radomes.org/museum/documents/
yagohttp://dbpedia.org/class/yago/
n12http://dbpedia.org/resource/Martin_AN/
dbthttp://dbpedia.org/resource/Template:
rdfshttp://www.w3.org/2000/01/rdf-schema#
freebasehttp://rdf.freebase.com/ns/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
owlhttp://www.w3.org/2002/07/owl#
n18http://dbpedia.org/resource/General_Electric_AN/
wikipedia-enhttp://en.wikipedia.org/wiki/
dbphttp://dbpedia.org/property/
dbchttp://dbpedia.org/resource/Category:
provhttp://www.w3.org/ns/prov#
xsdhhttp://www.w3.org/2001/XMLSchema#
goldhttp://purl.org/linguistics/gold/
wikidatahttp://www.wikidata.org/entity/
dbrhttp://dbpedia.org/resource/

Statements

Subject Item
dbr:NORAD_Control_Center
rdf:type
yago:Headquarters103504420 yago:WikicatUnitedStatesAirForceCommandPosts yago:Artifact100021939 yago:YagoPermanentlyLocatedEntity yago:YagoGeoEntity yago:Whole100003553 yago:MilitaryInstallation103763133 yago:PhysicalEntity100001930 yago:Facility103315023 owl:Thing dbo:MilitaryPerson yago:WikicatUnitedStatesArmyCommandPosts yago:WikicatColdWarMilitaryInstallationsOfTheUnitedStates yago:Object100002684 yago:CommandPost103076104
rdfs:label
NORAD Control Center
rdfs:comment
NORAD Control Centers (NCCs) were Cold War "joint direction centers" for command, control, and coordination of ground-controlled interception by both USAF Air Defense Command (ADC) and Army Air Defense Command (ARADCOM). The Joint Manual Steering Group was "formed by the Army and Air Force in July 1957 to support…collocation" of USAF Air Defense Direction Centers and Army Air Defense Command Posts, which began after a January 28, 1958, ADC/ARADCOM meeting with NORAD to "collocate the Fairchild-Geiger facilities" (operations began on May 15, 1958.) Army contracts for 5 NCCs had been let by August 17, 1958, after 1956 DoD approval for collocation of interim "pre-SAGE semiautomatic intercept systems" and radar squadrons at 10 planned Army Missile Master AADCPs (the remaining 5 Missile Master
owl:differentFrom
dbr:Peterson_Air_Force_Base dbr:Chidlaw_Building dbr:Cheyenne_Mountain_Complex dbr:ADC_command_centers dbr:Peterson_AFB n20:_Ent_AFB dbr:NORTHCOM dbr:Ent_Air_Force_Base
dbp:name
NORAD Control Center
dcterms:subject
dbc:United_States_Army_command_posts dbc:1959_establishments_in_Alaska dbc:United_States_Air_Force_command_posts dbc:North_American_Aerospace_Defense_Command
dbo:wikiPageID
39535230
dbo:wikiPageRevisionID
1091168279
dbo:wikiPageWikiLink
dbr:Ellsworth_AFB dbr:Minot_AFB dbr:Project_Nike dbr:Geiger_Field dbr:Snelling_Air_Force_Station dbr:Regional_Operations_Control_Center dbr:Ground-controlled_interception dbr:Army_Air_Defense_Command dbr:Olathe_Air_Force_Station n12:GSG-5_Battery_Integration_and_Radar_Display_Equipment n12:FSG-1_Antiaircraft_Defense_System dbr:Full_operational_capability dbr:Fairchild_AFB dbr:Army_Air_Defense_Command_Post dbc:1959_establishments_in_Alaska dbc:United_States_Army_command_posts n13:FSQ-8_Combat_Control_Central dbr:Chidlaw_Building n13:FYQ-93 dbr:Loring_AFB dbr:Duncanville_Air_Force_Station dbr:Mountain_Home_Air_Force_Base dbr:40th_Artillery_Brigade dbr:CIM-10_Bomarc n18:GPA-37_Course_Directing_Group dbr:United_States dbr:Back-Up_Interceptor_Control dbr:Offutt_AFB dbr:Joint_Use_Site_System dbr:San_Francisco_Defense_Area dbr:Glasgow_AFB dbr:United_States_Department_of_Defense dbr:Air_Defense_Command dbr:Air_Defense_Direction_Center dbr:Missile_Master dbr:Military_installation dbr:Semi-Automatic_Ground_Environment dbr:Fire_Island_Air_Force_Station dbr:List_of_United_States_Air_Force_radar_squadrons dbr:Davis-Monthan_AFB dbr:Malmstrom_AFB dbr:635th_Radar_Squadron dbr:AUTOVON dbr:Air_defense_artillery dbr:Command,_control,_and_coordination_system dbc:United_States_Air_Force_command_posts dbr:Joint_Surveillance_System dbr:Fairchild_Air_Force_Base dbr:Surface-to-air_missile dbr:Fort_Fisher dbr:Fort_Lawton_Air_Force_Station dbr:North_American_Air_Defense_Command dbr:Cold_War dbr:Mill_Valley_Air_Force_Station dbc:North_American_Aerospace_Defense_Command dbr:Belleville_Air_Force_Station dbr:Murphy_Dome_Air_Force_Station dbr:Colorado_Springs,_Colorado n13:FSQ-7_Combat_Direction_Central
dbo:wikiPageExternalLink
n17:GetTRDoc%3FLocation=U2&doc=GetTRDoc.pdf&AD=ADA331231 n22:FortFisher-1968-SouthernTelephoneNewsArticle.pdf%09%09NCC, n24:GetTRDoc%3FLocation=U2&doc=GetTRDoc.pdf&AD=ADA331231
owl:sameAs
freebase:m.0vshwm6 wikidata:Q16982863 n23:fjLu
dbp:wikiPageUsesTemplate
dbt:Clarify dbt:Cite_report dbt:Convert dbt:External_media dbt:Infobox_building dbt:Reflist dbt:! dbt:Specify dbt:Rp dbt:R dbt:Sic dbt:Distinguish
dbp:alternateNames
NORAD sector direction center Joint Manual Direction Center Joint Fire Direction Center
dbp:buildingType
dbr:Military_installation
dbp:caption
The "NORAD sector direction center" in a hardened blockhouse included a US Army "ADA battle staff officer" and "air defense artillery director consoles" manned by Army Air Defense Command to provide crosstelling of attack information to NIKE Defense Areas' Army Air Defense Command Posts .
dbp:date
May 2013
dbp:image
Fort Fisher Security Post, & radome
dbp:locationCountry
dbr:United_States
dbp:owner
dbr:North_American_Air_Defense_Command
dbp:reason
What computer allowed operations to begain--an AN/GPA-37? Were all of these locations NCCs, or were some just Army AADCPs without USAF operations?
dbp:status
Defunct
dbp:width
30
dbo:abstract
NORAD Control Centers (NCCs) were Cold War "joint direction centers" for command, control, and coordination of ground-controlled interception by both USAF Air Defense Command (ADC) and Army Air Defense Command (ARADCOM). The Joint Manual Steering Group was "formed by the Army and Air Force in July 1957 to support…collocation" of USAF Air Defense Direction Centers and Army Air Defense Command Posts, which began after a January 28, 1958, ADC/ARADCOM meeting with NORAD to "collocate the Fairchild-Geiger facilities" (operations began on May 15, 1958.) Army contracts for 5 NCCs had been let by August 17, 1958, after 1956 DoD approval for collocation of interim "pre-SAGE semiautomatic intercept systems" and radar squadrons at 10 planned Army Missile Master AADCPs (the remaining 5 Missile Master bunkers of the (JUSS) were delayed until the Missile Master Plan resolved the BOMARC/NIKE surface-to-air missile dispute.)
gold:hypernym
dbr:War
prov:wasDerivedFrom
wikipedia-en:NORAD_Control_Center?oldid=1091168279&ns=0
dbo:wikiPageLength
12355
foaf:isPrimaryTopicOf
wikipedia-en:NORAD_Control_Center