This HTML5 document contains 144 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
dcthttp://purl.org/dc/terms/
dbohttp://dbpedia.org/ontology/
n27http://dbpedia.org/resource/File:
foafhttp://xmlns.com/foaf/0.1/
n29http://www.lacity.org/mayor/myrtran/
n26http://www.mta.net/board/Items/2005/09_September/
n25https://global.dbpedia.org/id/
yagohttp://dbpedia.org/class/yago/
dbthttp://dbpedia.org/resource/Template:
n23http://www.metro.net/projects/connector/
rdfshttp://www.w3.org/2000/01/rdf-schema#
n19http://dbpedia.org/resource/APU/
freebasehttp://rdf.freebase.com/ns/
n4http://dbpedia.org/resource/7th_St/
n28http://dbpedia.org/resource/Grand_Av_Arts/
n5http://dbpedia.org/resource/Little_Tokyo/
n15http://commons.wikimedia.org/wiki/Special:FilePath/
n24http://dbpedia.org/resource/Pico/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
n10http://dbpedia.org/resource/7th_Street/
owlhttp://www.w3.org/2002/07/owl#
wikipedia-enhttp://en.wikipedia.org/wiki/
dbpedia-frhttp://fr.dbpedia.org/resource/
dbphttp://dbpedia.org/property/
dbchttp://dbpedia.org/resource/Category:
provhttp://www.w3.org/ns/prov#
xsdhhttp://www.w3.org/2001/XMLSchema#
goldhttp://purl.org/linguistics/gold/
wikidatahttp://www.wikidata.org/entity/
dbrhttp://dbpedia.org/resource/

Statements

Subject Item
dbr:Regional_Connector
rdf:type
yago:YagoPermanentlyLocatedEntity yago:Whole100003553 yago:Road104096066 dbo:RailwayLine dbo:Infrastructure dbo:ArchitecturalStructure dbo:RouteOfTransportation yago:Object100002684 wikidata:Q728937 yago:Way104564698 yago:PhysicalEntity100001930 owl:Thing yago:Artifact100021939 yago:Line103671272 yago:YagoGeoEntity
rdfs:label
Regional Connector Regional Connector
rdfs:comment
The Regional Connector Transit Project is a 1.9-mile (3.1 km) light rail tunnel under construction for the Los Angeles Metro Rail system in Downtown Los Angeles. It is designed to connect the A Line and E Line, which currently end at 7th Street/Metro Center station, to the existing L Line and Union Station. When completed, the project will provide a one-seat ride into the core of Downtown for passengers on those lines who currently need to transfer, and it will reduce or eliminate transfers for many passengers traveling across the region via Downtown. Le Regional Connector Transit Project est un tunnel de métro léger sur rail de 3,1 km en construction dans le centre-ville de Los Angeles. Il est conçu pour relier les lignes A (Bleu) et E (Expo) existantes à la station de la 7th Street / Metro Center à la ligne L (Gold) et à la gare de Los Angeles. La partie nord de la ligne L sera alors intégrée à la ligne A et la partie sud à la ligne E. Une fois terminé, le projet offrira un trajet pour les passagers des lignes qui ont actuellement besoin d’un transfert au cœur du centre-ville ; il réduira ou éliminera les transferts pour de nombreux passagers voyageant à travers la région via le centre-ville. Le projet est mis en œuvre par la Los Angeles County Metropolitan Transportation Authority (Metro).
foaf:name
Regional Connector Transit Project
foaf:homepage
n23:
dbp:name
Regional Connector Transit Project
foaf:depiction
n15:Little_Tokyo_Arts_District_station_under_construction,_July_2017.jpg n15:2019_Regional_Connector-01.svg
dbo:location
dbr:Downtown_Los_Angeles
dct:subject
dbc:Railroad_tunnels_in_California dbc:Proposed_railway_lines_in_California dbc:Los_Angeles_Metro_Rail_projects dbc:2023_in_rail_transport dbc:Tram_and_light_rail_transit_systems_under_construction
dbo:wikiPageID
7868806
dbo:wikiPageRevisionID
1124266502
dbo:wikiPageWikiLink
n4:Metro_Center_station dbr:East_Los_Angeles,_California n5:Arts_District_station dbr:D2_Subway dbr:Historic_Broadway_station dbr:Sierra_Madre_Villa_station dbr:Burbank,_California dbc:Railroad_tunnels_in_California n10:Metro_Center_station dbr:Little_Tokyo,_Los_Angeles dbr:COVID-19_pandemic dbr:Gold_Line_Foothill_Extension dbr:Exposition_Park_(Los_Angeles) dbr:2nd_Street_Tunnel dbr:Measure_R dbr:Blue_Line_(Los_Angeles_Metro) dbr:Bunker_Hill,_Los_Angeles,_California dbr:Environmental_Impact_Report dbr:Transportation_Systems_Management dbr:Los_Angeles_County_Metropolitan_Transportation_Authority dbc:Proposed_railway_lines_in_California dbr:Gold_Line_(Los_Angeles_Metro) dbr:Purple_Line_Extension dbr:Alameda_Street dbr:B_Line_(Los_Angeles_Metro) dbr:Rapid_transit dbr:A_Line_(Los_Angeles_Metro) dbr:Major_Investment_Study dbr:Broadway,_Los_Angeles dbr:Santa_Monica,_California dbr:Colburn_School_of_Music dbc:Los_Angeles_Metro_Rail_projects n19:Citrus_College_station dbr:Walt_Disney_Concert_Hall dbr:Japanese_American_National_Museum dbr:Los_Angeles_City_Hall dbr:Light_rail dbr:Oslo_Tunnel dbr:K_Line_(Los_Angeles_Metro) dbr:Pasadena,_California dbr:Expo_Line_(Los_Angeles_Metro) dbr:E_Line_(Los_Angeles_Metro) dbr:California_State_Route_47 dbr:Tunnel dbr:Center_City_Commuter_Connection n24:Aliso_station dbr:Environmental_impact_statement dbr:Civic_Center,_Los_Angeles,_California dbr:Union_Station_(Los_Angeles) dbr:Los_Angeles_Music_Center dbr:Temple_Street_(Los_Angeles) dbr:Downtown_Los_Angeles dbr:L_Line_(Los_Angeles_Metro) n5:Arts_District_(Los_Angeles_Metro_station) dbr:Los_Angeles_Metro_Rail dbr:1st_Street_(Los_Angeles) dbr:Environmental_Impact_Statement dbr:Coast_Tram_(Belgium) dbr:Karlsruhe_Stadtbahn dbr:Broadway_(Los_Angeles) dbr:Atlantic_station_(Los_Angeles_Metro) dbr:History_of_Los_Angeles_Metro_Rail_and_Busway dbc:Tram_and_light_rail_transit_systems_under_construction n27:Little_Tokyo_Arts_District_station_under_construction,_July_2017.JPG dbr:Glendale,_California dbc:2023_in_rail_transport dbr:Tunnel_boring_machine n28:Bunker_Hill_station dbr:Azusa,_California
dbo:wikiPageExternalLink
n26:20050914Rev.Item7P&P.pdf n23: n29:mayormyrtran246438958_07052006.pdf
owl:sameAs
dbpedia-fr:Regional_Connector freebase:m.026gx56 wikidata:Q7309029 n25:4tgue
dbp:stations
3
dbp:wikiPageUsesTemplate
dbt:Start_date dbt:Cvt dbt:Track_gauge dbt:URL dbt:Citation_needed dbt:LACMTA_Regional_Connector dbt:LACMTA_icon_strip dbt:Convert dbt:Los_Angeles_County_Metropolitan_Transportation_Authority dbt:Infobox_rail_line dbt:LAMs dbt:Reflist dbt:Short_description dbt:Commons_category dbt:Use_mdy_dates
dbo:thumbnail
n15:2019_Regional_Connector-01.svg?width=300
dbp:caption
Map of the approved route of the Regional Connector
dbp:locale
dbr:Downtown_Los_Angeles
dbp:owner
dbr:Los_Angeles_County_Metropolitan_Transportation_Authority
dbp:status
In testing
dbp:system
dbr:Los_Angeles_Metro_Rail
dbp:type
dbr:Light_rail
dbo:abstract
Le Regional Connector Transit Project est un tunnel de métro léger sur rail de 3,1 km en construction dans le centre-ville de Los Angeles. Il est conçu pour relier les lignes A (Bleu) et E (Expo) existantes à la station de la 7th Street / Metro Center à la ligne L (Gold) et à la gare de Los Angeles. La partie nord de la ligne L sera alors intégrée à la ligne A et la partie sud à la ligne E. Une fois terminé, le projet offrira un trajet pour les passagers des lignes qui ont actuellement besoin d’un transfert au cœur du centre-ville ; il réduira ou éliminera les transferts pour de nombreux passagers voyageant à travers la région via le centre-ville. Le projet est mis en œuvre par la Los Angeles County Metropolitan Transportation Authority (Metro). L’étude d’impact environnemental a été achevée en septembre 2010 et il a été certifié par le Conseil d’administration de Metro le 26 avril 2012. Les travaux ont débuté le 30 septembre 2014. Initialement prévu pour ouvrir en 2020, mais retardé en raison de difficultés de construction, le projet était achevé à 77,6% en mars 2021. * Portail de Los Angeles * Portail des transports en commun The Regional Connector Transit Project is a 1.9-mile (3.1 km) light rail tunnel under construction for the Los Angeles Metro Rail system in Downtown Los Angeles. It is designed to connect the A Line and E Line, which currently end at 7th Street/Metro Center station, to the existing L Line and Union Station. When completed, the project will provide a one-seat ride into the core of Downtown for passengers on those lines who currently need to transfer, and it will reduce or eliminate transfers for many passengers traveling across the region via Downtown. The project is being implemented by the Los Angeles County Metropolitan Transportation Authority (Metro). It has been given high priority by Metro in its long-range plan and has funding set aside in Measure R. The draft environmental impact statement was completed in September 2010, selection of a preferred alternative was completed in late October 2010, and the Final Environmental Impact Report was certified on April 26, 2012. Pre-construction on the project began in December 2012. The contract for heavy construction on the project was signed on July 9, 2014, and its official groundbreaking was held on September 30, 2014. Originally scheduled to open in 2020 but delayed due to construction difficulties, the project is 90% completed as of April 2022 with train testing commencing and revenue service expected to start in early 2023.
dbp:character
Fully underground
dbo:lineLength
3057.7536
dbo:numberOfStations
3
gold:hypernym
dbr:Corridor
prov:wasDerivedFrom
wikipedia-en:Regional_Connector?oldid=1124266502&ns=0
dbo:wikiPageLength
28414
dbo:status
In testing
dbo:isPartOf
dbr:Los_Angeles_Metro_Rail
dbo:owner
dbr:Los_Angeles_County_Metropolitan_Transportation_Authority
dbo:type
dbr:Light_rail
foaf:isPrimaryTopicOf
wikipedia-en:Regional_Connector