This HTML5 document contains 57 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
dctermshttp://purl.org/dc/terms/
n15http://www.dsireusa.org/incentives/
dbohttp://dbpedia.org/ontology/
foafhttp://xmlns.com/foaf/0.1/
n4http://dbpedia.org/resource/File:
n9http://www.eia.gov/electricity/data/browser/
n7https://global.dbpedia.org/id/
dbthttp://dbpedia.org/resource/Template:
rdfshttp://www.w3.org/2000/01/rdf-schema#
freebasehttp://rdf.freebase.com/ns/
n13http://commons.wikimedia.org/wiki/Special:FilePath/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
owlhttp://www.w3.org/2002/07/owl#
wikipedia-enhttp://en.wikipedia.org/wiki/
dbchttp://dbpedia.org/resource/Category:
dbphttp://dbpedia.org/property/
provhttp://www.w3.org/ns/prov#
xsdhhttp://www.w3.org/2001/XMLSchema#
wikidatahttp://www.wikidata.org/entity/
dbrhttp://dbpedia.org/resource/

Statements

Subject Item
dbr:Solar_power_in_Ohio
rdfs:label
Solar power in Ohio
rdfs:comment
Solar power in Ohio has been increasing, as the cost of photovoltaics has decreased. Ohio installed 10 MW of solar in 2015. Ohio adopted a net metering rule which allows any customer generating up to 25 kW to use net metering, with the kilowatt hour surplus rolled over each month, and paid by the utility once a year at the generation rate upon request. For hospitals there is no limit on size, but two meters are required, one for generation, the other for utility supplied power. The First Solar factory in Perrysburg can produce almost 600 MW of panels per year.
foaf:depiction
n13:Front_View_of_the_Great_Lakes_Science_Center.jpg
dcterms:subject
dbc:Solar_power_in_the_United_States_by_state dbc:Energy_in_Ohio
dbo:wikiPageID
35927153
dbo:wikiPageRevisionID
1124092762
dbo:wikiPageWikiLink
n4:Front_View_of_the_Great_Lakes_Science_Center.jpg dbr:Renewable_energy_in_the_United_States dbr:Solar_canopy dbc:Energy_in_Ohio dbr:Wyandot_County,_Ohio dbr:Dayton,_Ohio dbr:Solar_roadway dbr:Photovoltaics dbr:Advanced_Distributed_Generation dbr:Solar_Roadways dbr:American_Electric_Power dbr:Net_metering dbr:Upper_Sandusky,_Ohio dbr:Ohio dbr:Napoleon,_Ohio dbr:DPL_Inc. dbr:Photovoltaic_power_station dbr:Campbell_Soup_Company dbr:Perrysburg,_Ohio dbr:First_Solar dbr:Zachary_Layman dbr:University_of_Toledo dbc:Solar_power_in_the_United_States_by_state dbr:University_of_Dayton dbr:Solar_power_in_the_United_States dbr:Veterans'_Glass_City_Skyway dbr:Ohio_Department_of_Transportation dbr:Wind_power_in_Ohio dbr:Solar_array dbr:Germany dbr:Akron_Metro_Regional_Transit_Authority dbr:Renewable_portfolio_standard
dbo:wikiPageExternalLink
n9:%7Cpublisher=U.S. n15:index.cfm%3FgetRE=1%3Fre=1&ee=0&state=OH
owl:sameAs
n7:4vEGH wikidata:Q7556812 freebase:m.0jwx_9y
dbp:wikiPageUsesTemplate
dbt:Convert dbt:Update-inline dbt:Reflist dbt:Short_description dbt:Solar_power_in_the_United_States dbt:Commons_category dbt:Portal dbt:Energy_in_the_USA
dbo:thumbnail
n13:Front_View_of_the_Great_Lakes_Science_Center.jpg?width=300
dbo:abstract
Solar power in Ohio has been increasing, as the cost of photovoltaics has decreased. Ohio installed 10 MW of solar in 2015. Ohio adopted a net metering rule which allows any customer generating up to 25 kW to use net metering, with the kilowatt hour surplus rolled over each month, and paid by the utility once a year at the generation rate upon request. For hospitals there is no limit on size, but two meters are required, one for generation, the other for utility supplied power. In 2010, the 12 MW solar farm in Upper Sandusky was the largest solar farm in the state. It was later surpassed by the 20MW DG AMP Solar Bowling Green farm, which was completed in January 2017. The First Solar factory in Perrysburg can produce almost 600 MW of panels per year. Costs have decreased to the point that the average consumer may save approximately $17,527 over a 20-year period by installing solar panels. Euclid's City Hall and library installed solar panels and expects to save $25,000 over the next 15 years. The panels were installed at no cost to the city by Ohio Cooperative Solar, which is leasing the rooftops.
prov:wasDerivedFrom
wikipedia-en:Solar_power_in_Ohio?oldid=1124092762&ns=0
dbo:wikiPageLength
17518
foaf:isPrimaryTopicOf
wikipedia-en:Solar_power_in_Ohio