. . . . . . . "Sherbino Mesa Wind Farm"@en . "30.81100082397461"^^ . . . . . . . . . . "110"^^ . "-102.3619995117188"^^ . "POINT(-102.36199951172 30.811000823975)"^^ . "The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project. Phase II, located on a 20,000-acre (8,100 ha) site 40 miles (64 km) west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW. This phase will be in operation by the end of 2011."@en . . "Sherbino Mesa Wind Farm"@en . . . . . . "300000000.0"^^ . . . . "19885736"^^ . . . . "300.0"^^ . . . "Vestas V-90, Clipper Windpower C-96"@en . . . . . "30.811 -102.362" . . . . . . . . . "1114996874"^^ . "2441"^^ . . . . . "Sherbino Wind Farm"@en . "The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project. Phase II, located on a 20,000-acre (8,100 ha) site 40 miles (64 km) west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW. This phase will be in operation by the end of 2011."@en . . . . . . . . . "United States"@en . .