North Hoyle Offshore Wind Farm is Wales' first offshore wind farm, and the UK's first major offshore renewable power project. Situated in Liverpool Bay, it commenced operation in 2003. The first of the UK's Round 1 offshore wind farms, North Hoyle covers an area of 10 square kilometres (3.9 sq mi), and is located approximately 7.5 kilometres (4.7 mi) off the coast of North Wales, between the towns of Rhyl and Prestatyn. The Round 1 projects were intended to act as testbeds; building the UK's understanding of offshore wind power, whilst in total also providing well over 1,000 MW of green generating capacity for the UK. All of the Round 1 offshore wind farms were limited to a maximum area of 10 square kilometres (3.9 sq mi), and no more than 30 wind turbines.

AttributesValues
rdf:type
rdfs:label
  • Offshore-Windpark North Hoyle (de)
  • North Hoyle Offshore Wind Farm (en)
  • ВЕС Норт-Хойл (uk)
rdfs:comment
  • Der Windpark North Hoyle ist ein Offshore-Windpark in der Irischen See (Liverpool Bay / Bucht von Liverpool) etwa 8 Kilometer vor der Küste von Denbighshire, Wales (Vereinigtes Königreich) zwischen Rhyl und Prestatyn. (de)
  • North Hoyle Offshore Wind Farm is Wales' first offshore wind farm, and the UK's first major offshore renewable power project. Situated in Liverpool Bay, it commenced operation in 2003. The first of the UK's Round 1 offshore wind farms, North Hoyle covers an area of 10 square kilometres (3.9 sq mi), and is located approximately 7.5 kilometres (4.7 mi) off the coast of North Wales, between the towns of Rhyl and Prestatyn. The Round 1 projects were intended to act as testbeds; building the UK's understanding of offshore wind power, whilst in total also providing well over 1,000 MW of green generating capacity for the UK. All of the Round 1 offshore wind farms were limited to a maximum area of 10 square kilometres (3.9 sq mi), and no more than 30 wind turbines. (en)
  • ВЕС Норт-Хойл (англ. North Hoyle) — британська офшорна вітроелектростанція, споруджена в Ірландському морі біля північного узбережжя Уельсу. Стала першою великою офшорною станцією в країні. Місце для розміщення ВЕС обрали за 8—11 км від Ріл (узбережжя Денбігширу). Первісно планувалось, що всі основні роботи (облаштування паль, монтаж перехідних елементів та власне вітроагрегатів) виконає перше в історії спеціалізоване судно для встановлення вітрових турбін MPI Resolution. Проте затримки у його поставці з китайської верфі змусили залучити інші кораблі. Так, починаючи з квітня 2003 року монтаж паль, які досягали глибини 33 метра під морським дном, провадило судно Excalibur, а встановлення на них перехідних елементів здійснювало інше самопідйомне судно Wind. (uk)
foaf:name
  • North Hoyle Offshore Wind Farm (en)
name
  • North Hoyle Offshore Wind Farm (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/North_Hoyle_Offshore_Wind_Farm_aerial.jpg
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
wind farm type
  • Offshore (en)
dbp:wikiPageUsesTemplate
thumbnail
country
image caption
  • Viewed from the air (en)
location
  • Liverpool Bay, north east Wales (en)
operator
status
  • O (en)
commissioned
georss:point
  • 53.43333333333333 -3.4
has abstract
  • Der Windpark North Hoyle ist ein Offshore-Windpark in der Irischen See (Liverpool Bay / Bucht von Liverpool) etwa 8 Kilometer vor der Küste von Denbighshire, Wales (Vereinigtes Königreich) zwischen Rhyl und Prestatyn. (de)
  • North Hoyle Offshore Wind Farm is Wales' first offshore wind farm, and the UK's first major offshore renewable power project. Situated in Liverpool Bay, it commenced operation in 2003. The first of the UK's Round 1 offshore wind farms, North Hoyle covers an area of 10 square kilometres (3.9 sq mi), and is located approximately 7.5 kilometres (4.7 mi) off the coast of North Wales, between the towns of Rhyl and Prestatyn. The Round 1 projects were intended to act as testbeds; building the UK's understanding of offshore wind power, whilst in total also providing well over 1,000 MW of green generating capacity for the UK. All of the Round 1 offshore wind farms were limited to a maximum area of 10 square kilometres (3.9 sq mi), and no more than 30 wind turbines. The wind farm's 30 Vestas V80 Offshore wind turbines are each rated at 2 MW capacity, giving a maximum project output of 60 MW. At the time of installation this was the most powerful wind farm in the UK, producing sufficient electricity annually to power 50,000 homes.Between 2004 and 2010, the capacity factor was between 33 and 36%. Its levelised cost has been estimated at £77/MWh. Independent surveys carried out for the operators of North Hoyle have shown that the wind farm is very popular among holidaymakers and local residents. An opinion poll carried out in 2003, after its construction, showed that 73% of people expressed support for the project and only 5% opposed it. North Hoyle was developed, built and is operated by RWE npower renewables (formerly National Wind Power); npower renewables also owns the neighbouring Rhyl Flats and Gwynt y Môr offshore wind farms. (en)
  • ВЕС Норт-Хойл (англ. North Hoyle) — британська офшорна вітроелектростанція, споруджена в Ірландському морі біля північного узбережжя Уельсу. Стала першою великою офшорною станцією в країні. Місце для розміщення ВЕС обрали за 8—11 км від Ріл (узбережжя Денбігширу). Первісно планувалось, що всі основні роботи (облаштування паль, монтаж перехідних елементів та власне вітроагрегатів) виконає перше в історії спеціалізоване судно для встановлення вітрових турбін MPI Resolution. Проте затримки у його поставці з китайської верфі змусили залучити інші кораблі. Так, починаючи з квітня 2003 року монтаж паль, які досягали глибини 33 метра під морським дном, провадило судно Excalibur, а встановлення на них перехідних елементів здійснювало інше самопідйомне судно Wind. Після цього той же Excalibur разом з судном JB1 провели монтаж 27 із 30 вітрових турбін, тоді як останні три агрегати . встановило вже MPI Resolution. Останнє крім того за допомогою свого дистанційно керованого апарату LBT1 проклало з'єднувальні кабелі. Головний експортний кабель укладала баржа , що використовувала спеціальний плуг для риття траншеї. Під час будівництва йому перешкоджали шторми та пошкодження суден. Так, у Excalibur виявилась зламаною одна з опор, тоді як на JB1 завалився кран. Проте всі роботи були завершені до березня 2004 року. ВЕС складається із 30 вітроагрегатів компанії Vestas типу V80/2000 з одиничною потужністю 2 МВт та діаметром ротора 80 метрів, які встановлені на баштах висотою 67 метрів. В цьому районі наявні сильні припливні явища, через що глибина коливається у різні періоди від 12 до 21 метра. Проект вартістю 80 млн фунтів стерлінгів реалізувала енергетична компанія RWE, яка продала його у 2005-му, а за декілька років по тому спорудила поряд іншу ВЕС Ріл-Флетс. (uk)
ps electrical cap fac
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software